Laserfiche WebLink
15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />2 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />effect even if the DEV-ELOPER sells one or more lots, the entire Plat, or any <br />part of it. <br />D. The DEVELOPER shall pay in full all hills submitted to it by the CITY for <br />obligations incurred under this Contract within thirty (30) days after receipt. <br />If the bills are not paid on time, the CITE` may halt Plat development work <br />and construction including, but not limited to, the issuance of building permits <br />for lots which the DEVELOPER may or nnay not have sold, until the hills are <br />paid in full. Bills not paid within thirty (30) days shall accrue interest at the <br />rate of nine percent (9 %) per year. <br />E. In addition to the charges referred to herein, other applicable charges may be <br />imposed such as, but not limited to, sewer availability charges ("SAC"), city <br />water connection charges, city sewer connection charges, city storm water <br />connection charges and building permit fees. <br />18. Ruildina Permits. No building perms is shall be issued until the following items are <br />complied with: <br />A. In order to provide emergency vehicle access, a passable Class 5 road base <br />must be extended to within 150 feet of any address seeking a building permit. <br />To the extent that it helps, footings and foundations and basements are not <br />considered structures and therefore, it would be possible to do this work <br />anywhere on the site beyond the 150 foot radius from a Class 5 drive. The <br />CITY may issue building permits for these structures with a limitation that the <br />construction not extend beyond the basement until emergency vehicle access <br />can be provided. <br />B. Temporary address numbers shall be displayed on the building site during <br />construction. <br />C. while building permits may be issued on a Class 5 road base, certificates of <br />occupancy will not be issued until curb and gutter and bituminous surfacing <br />(at least the first lift) are installed. Other occupancy standards include the <br />installation of a hard surface driveway, and boulevard landscaping. <br />D. In order to protect against erosion and to maintain the cleanli <br />in ness of the site, <br />erosion control will be required as indicated in Paragraph 11. Cement trucks <br />must be cleaned before leaving the project. <br />E. Curb cuts by builder shall be constructed as per CITY specifications for <br />replacing concrete curbs and driveways. <br />Page 8of12 <br />