My WebLink
|
Help
|
About
|
Sign Out
Home
2003_0616_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_0616_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2011 4:33:17 PM
Creation date
10/21/2011 4:22:25 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Until the planning Commission meeting, the applicants (owner and/or tenant) have been <br />reluctant to make this type of investment. A permit from Rice Creek watershed may also <br />he necessary. <br />1.5 The staff did offer the option to create an Interim Use Permit (5 year limited pem- it and <br />potentially renewable). The tenant, Watkins Trucking desired a permit and approval with <br />more permanence. <br />2.1 The Community Development Staff' car of recommend issuance a permit for this case <br />(except an Interim Use Permit) because the City Code does not permit re- establishment or <br />expansion of a pre - existing non - conforming use issue. <br />3.0 PLANNING oMNH ION ACTION: <br />3.1 On June 4, 2003, the planning Commission recommended denial of the gMeal to the <br />Council to allow a non- permitted use (truck parking) to expand to a B -6 zoned parcel <br />owned by western resources with tenant Watkins Trucking located at 2560 Long Lake <br />Road. By a Grote of 5 -1, the Planning Co ssion did recommend apiproval of an <br />interim use permit to allow storalie and use of the site for seasonal and peak period <br />trailer storaize. <br />4.0 SUGGESTED COUNCIL ACTION: <br />By resolution, approve of the issuance of a 5 year Interim Use Permit to Western <br />Resources and Wat s Truc g, 2650 Long Labe Road, subject to interim use <br />standards for interim use parking, which include a grading plan and proper drainage; <br />packed, dustless gavel; fencing, landscaping screening, ponding as needed, and lighting. <br />The applicant may request the Council to consider renewing the per during the <br />last 120 days of the 5 year permit; the Interim Use Per to he subject to review by <br />the City Attorney as to form and content* <br />Attachments: photos and site application, site drawings, draft resolution. <br />\\Vic tai a CommDevTlann1ng Files\345 3499\_3485_western Resourceslrcapt3485(061 603 )doc <br />pF 3485 — Western resource Resources <br />
The URL can be used to link to this page
Your browser does not support the video tag.