Laserfiche WebLink
either available at the site or shall be installed by the applicant, prior to <br />occupancy, in a manner approved by the city engineer; <br />5. The use will provide either or both of the following benefits: <br />a. A benefit to the property, including, but not limited to, the elimination <br />of blight or unsightly or hazardous conditions, or the installation of <br />improvements and occupancy that will facilitate preservation or <br />redevelopment of the property, and/or <br />b. A benefit to the public, such as the creation of jobs, revenues, or the <br />provision of needed goods or services, and <br />WHEREAS, Section 101 2.09B states: the City Council may attach conditions to <br />interim use permits. In reviewing interim use permit applications, the City will establish <br />a specific date or event that will terminate the use on the property. The Council will also <br />determine that the approval of the interim use would not result in adverse effects on the <br />public health, safety and general welfare, and that it will not impose additional costs on <br />the public if it is necessary for the public to take the property in the future; and <br />WHEREAS, western resources and Watkins Trucking are currently operating a <br />legally pre - existing non - conforming truck terminal and storage operation on other <br />portions of the property, at 2560 Long Labe road within an "B -6 "' Mixed Use Business <br />Park zoning district, and <br />WHEREAS, western Resources and Watkins Trucking has requested approval of <br />an Interim Use permit to utilize adjoining parcel as a seasonal and peak period truck <br />parking and storage area, and <br />WHEREAS, exterior impacts such as parking, traffic, c, anal noise, as ire l l as the <br />spatial needs for the seasonal and peak period trucking and storage, are similar to those <br />heeded for the adjacent legally pore - existing and non - conforming truck terminal do not <br />require interior or exterior expansion of the existing buildings and utilities, and <br />WHEREAS,, the Roseville planning C 0rnrnission held the required public hearing <br />on .Tune 4, 2003 to consider the western resourcesAVatkins request and recommended (5- <br />1 ) approval of the interim use permit, subject to the following standard intern use <br />conditions,-, <br />1, If the use is being operated by a person other than the current applicants <br />(Watkins) for the Interim Use pmt of the property, the permit shall require <br />both the owner and the operator to furnish the city with an agreement (or a <br />copy of a lease containing such agreement) that-. <br />a. the operators right to possession of the premises for the purpose of <br />conducting the interim use is dependent upon the interim use permit <br />having been granted and maintained in full force and effect; and <br />2 <br />