My WebLink
|
Help
|
About
|
Sign Out
Home
2003_0331_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_0331_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2011 10:21:36 AM
Creation date
10/24/2011 9:44:34 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.17 The structure will be of similar materials to that of Abra, including color impregnated or <br />stained -on -site panels similar to the Opus Gateway project. The Cascl building will also <br />use pre - finished metal and anodized window and door frames. <br />4.1$ The structure as proposed is $Q feet wide (north to south) and 90 feet deep (east to west), <br />and will have an approximate height of 20 feet. <br />4.19 Trash and recyclables will be contained in an independent enclosure that has a roof and <br />access gates. This structure lies in the southeast corner of the rear truck access drive <br />6.0 POLICY (Comprehensive Ilan Consistency) & FISCAL IMPLICATIONS: <br />Chapter 3, Section IV of the Roseville Comprehensive Plan encourages <br />redevelopment and clean -up of outdated commercial /industrial buildings and <br />properties. <br />Planning District 10 and the Tower Place Laster Plan encourages a diversity of <br />redevelopment uses; and job opportunities, with redevelopment to be completed <br />on a market- driven schedule. <br />63 Increase in Market value: The Community Development Staff has estimated that the <br />market value of the two proposed developments w111. more than triple the property's <br />current $460,000 market value. <br />.4 Jobs: The applicants have estimated that Abra will employ 20 to 25 people, 95% of <br />whom are full time employees who care $20,000 to $80,000 per year, with over half the <br />employees earning over $50,000 per year. The Casci development will retain the 5 <br />existing employees. <br />7.0 PROJECT IMPA ' : <br />7.1 Daily vehicle counts on County Road C are 16,000, with an anticipated volume of 17,300 <br />by 2010 and 1 8,700 by 2020. The applicant has estimated that the Abra facility will have <br />a pear hour volume of 26 trips and a daily movement of 224 vehicles. Staff has <br />estimated the C asc i site will have an average daily traffic volume of 20 to 30 vehicles and <br />a very limited peak hour movement. This project will have no significant impact on <br />existing traffic movement. <br />7.2 Section 1007.01 F2 reads: "Number of Off -- Street parking Spaces: There shall be two <br />parking spaces for every three employees necessary to operate a full shift at design <br />capacity of one space for each 1,000 square feet of floor area, whichever is greater." The <br />City Planner has determined that this site plan proposal exceeds the city requirements. <br />The City Planner has applied the Code requirements and determined the following: <br />a. 25 employees @ 2 per every 3 employees = 171; t g <br />b. 17,950 @ I space for each 1,000 sq. ft.,,;; 18 spaces or a total of 35 on -site spaces. <br />PF3448 RCA Concept Plan - 033103 Page 4 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.