<br />1'onn of Agreement Between Owner and Construction
<br />Manager, current as of the date of this Agreernen t.
<br />1.1.3 The Architect's services shall be performed as
<br />expeditiously as is consistent wiLh pro fe.ssxonal skill and care
<br />and the orderly progress of the Work. The Architect shall
<br />submit for the Owner's approval and the Construction
<br />Manager's information a schedule for the perfonnance of the
<br />Architects services which may be adjusted as the Project
<br />proceeds, and shall include allowances for periad�s of Lime
<br />required for the Owner's and C011SLruction Manager's review
<br />and for approval of submissions by authorities having
<br />jurisdiction over the Project. Time hi nits established by this
<br />schedule approved by the Owner shah not, except for
<br />reasonable cause, be exceeded by the Architect or Owner.
<br />1.1.4 The services covered by thb; Agreement are subject to
<br />1 e tirne limitations contained in Subparagraph 11.5.1.
<br />ARTICLE 2
<br />SCOPE OF ARCHITECTtS BASIC SEVICES
<br />2.1.1 The Architect's Basic Sen ►ices consist of those
<br />described in PamgraphS 2.2 through 2.6 and any other services
<br />identified �i Article 12 as part of Basic Senrlces, and include
<br />no rnial structural, rnech anical and electrical engineering
<br />services,. and I g a arch'Itocture.
<br />2,2 SCHEMATIC DESIGN PHASE
<br />2.2.1 The Architect shall review the prograin, schedule: and
<br />construction budget furnished by the Owner to ascerlairt the
<br />requiremen is of the Project and ,shall arrive a L a mutual
<br />understands ig of such requirements with the Owner.—The
<br />Architect will Visua J e above g rotjn tina _
<br />condftigns and make measured S of th
<br />conditions tIse with any prop!2t%pd stru otion -
<br />2.2.2 The Architect shall review witli the Owner and
<br />onsU- action Manager proposed site use and improvements-
<br />selection of materials, building systems and equipment; acid
<br />methods of Project delivery.
<br />2.2.3 The Architcct shall review with the Owner and
<br />Construction Manager alternative approaches to design and
<br />construction of the project.
<br />2.2.4 rased an the mutually agreed-upon prograrn,
<br />schedule and cohstruction budget requirernerltsr the Architect
<br />shall prepare, for approval by the Owner, Schematic Design
<br />Documents consisting of drawings and other documents
<br />illustrating the scale slid reta Lionship of Project componenm
<br />2.2.5 At inLenrals appropriate to Lhe progress of the
<br />Schematic Design phase and mutual ty agreeable to the Owner,,
<br />Construetion Manager and Architect, the Architect shall
<br />pih ide sdiematic ales - n studies for the Owner's review and
<br />the Construction Manager's in ortnation-
<br />Z ooa
<br />2,2,6 in the further development of the drawings and
<br />specifications during this and subsequen t phases o f deli , the
<br />Archited shall be entitled to amume the accuracy of the
<br />estiniates of Construction Cost winch are to be provided by the
<br />Construction Manager udder the Construction Manager's
<br />agreement with the der.
<br />2.2.7 Upon completion of the Schematic Design Phase, the
<br />Architect shah provide drawings, outie speccatins and
<br />other docuxel�ts for the per's approval and the
<br />Cc nstrvc lion Manager's in.formatian.
<br />2.3 DESIGN DEVELOPMENT PHASE
<br />2.3.1 Based on the approved Schematic Design Documents
<br />and any adjusunenfs authorized by the Owner in the progranl,
<br />schedule or construct ion budget, the Architect shall prepare
<br />Design Development Docume rats for the instruction
<br />Manager's review and the Ownees approval, The Design
<br />Development Documents . half be based ul)oln data and
<br />estimates prepared by the Construction Manager and shall
<br />consist of drawings and other documents that estahllsh and
<br />describe the size and character of the project as Lo architectural,
<br />structural, mechanical and electrical systel -ns. Materials and
<br />such other elements as i ay be appropriate.
<br />2,3.2 At intervals mutually agreeable to the Owner,
<br />Constructi o ti Manager and Architect, the Architect shall
<br />provide drawins and other documents which depict the
<br />current status of design development for the Owner's review
<br />and the Cons [ruction Manager's inforrn.ati on_
<br />2.3,3 upon coral >letlon of the Design Development Phase,
<br />the Architect shall provide drawings, outline specifications and
<br />other docunncYnts for the Owner's approval and the
<br />Co tistruction Manager's M' foniiadon+
<br />2.4 CONSTRUCTION DOCUMENTS ENTS PHASE
<br />2.4.1 Based on the approved Design Development
<br />Documents and any Further adjusir nenis au Lhorized by the
<br />Owner in the scope or quality of the project or in the
<br />cc nsttuction budge t r the Architect, u Qzirng data and estimates
<br />prepared by the Construction Manager, shall prepare, for
<br />approval by the Owner, Construction Documents consisting of
<br />Drawings and. SPecifkaLions setting forth in rleWl the
<br />requirements for the construction of the Project..
<br />2.4.2 At intervals Mutually agreeable to the Owner,
<br />Cons- truction Manager and Architect, the Architect shall
<br />provide Drawings and Specifications for the Qwner's and the
<br />Construction Manager's review.
<br />2.4.3 Upon completion of the Cons trucdon Documents
<br />Phase, the Architect ,shall provide Conaruction Documents for
<br />the Owner's approval and the Construction Manager's
<br />information.
<br />�b
<br />f
<br />A A 0C U a N Ft -AR fi - C� - ANAGE R -Aa N - 19 - AIA - 1 -
<br />7HE AMERICAN INSTITUTE OF ARUHITECTS, 1735 NEW YORK AVENUE N.W.0 WASHINGTON, D.C. 200016-5292- WARNING: Unlicensed photocopying
<br />Sri glares US, co pyrIght laws and will sub jeer the violator to legal pro! ecution, This document was electronically produced with permission of the
<br />AiA and can be reproduced in accordance with your ke nse without violation until The date of eXp i ratlgn as noted below. User Document: Z(1)-
<br />44(b 1411 ). ai a -- 112 ,8/2003. A [A License Num ber 100186 .3+ whi Ch exp Tres �,n 2/212003.
<br />Electronic Format 8141 /CM a -199.2
<br />2
<br />
|