Laserfiche WebLink
U 3 0" ?. 7 if U3 THU 13 a, Z7 FAX 612 645 0 2 13 ANKENY KELL ARC I'C'ECT S FA 2005 <br />CITY of ROSEVILLE PUBLIC SAFETY & PUEILiC WORKS PROJECT <br />B 141 /Cma Standard Form of Agreement Between Owner and Architect <br />ATTACHMENT'A' <br />PROJECT DESCRIPTION <br />The project is proposed to be completed as a single project with phased construction on the current <br />City lull and Public Works sites. The project is expected to be designed and hid in three bid <br />packages. Thee first package for site grading, ps fving and utilities, the second for building excavation, <br />footings/foundations and structural systems and the third for the remaining architectural and <br />landscaping compone nts.The City of Roseville C*,ntic Epatas entering into a contract with Mc Gough <br />Construction as Construction Manager Advisor i lA B801 / ma). Under the Owner /Architect <br />Ag reemen t (Al A B 141 ]Cma) , AKA wi fl coo rd inat.) work with th a se lected Cons truction Manage r. <br />PUBLIC �FETYI <br />The Public Safety prolaet consists of a major addition of 411000 g.sj. for expansion of the police <br />department. On the upper level, new areas i ncl L de: <br />police administration - offices, conferenf)e room, work room <br />investigation - offices, conference room interview rooms <br />patrol areas - afflices, report writing, roll call <br />evidence areas - office, processing, sto -age <br />detention - holding cells, intervlaw rooms, support spaces <br />on -grade garage - bulb property, vehicki processing <br />shared police facilities - lunchroom, locker rooms, defensive tactics, storage <br />a new main entry and info desk to the C fly Hall, linking the existing and naw construction <br />On the lower level new areas Include. <br />E0 /training room for 50 + 90 people <br />Inclosed garage for 35 vehicles <br />support spaces including mechanical, electrical and storage rooms <br />The Public Safety project also inclines 1,490 g.s.f, of interior demolition and renovation of existing <br />City Hall areas including the re pl aoe me nt of a s1 alr and creating spaces in the lower level to support <br />the EO / #raining room, including new toilet roo r is, a phone room and communications closet. <br />Additional work within the existing City Hall is not included iri. the base contract. The estimated <br />construction budget with contingency of Me e Rublic Safety project is K350r925. <br />BLl WORKS-. <br />The Public Works project consists of the following: <br />* demolition and replacement of the vehic :I a storage/maintenance garage with a 29,450 g.s. f. <br />addition for vehicle storage and maintenance, shop areas, are office and parts room. It will <br />also include 2,300 s.f. of mezzanine sic rage space. <br />addition of 2r250 g. s.f. for office area e).pan sion and training/] u nch room <br />renovation of 5,070 s.f. of existing officers, lours and support spaces <br />renovation of 81370 g.s.f. of existing Ba .k & Recreation garage areas including a wood shop <br />a 3,000 0. salt/sand storage building and <br />expansion of the existing yard area with a new screen wall, <br />The estimated construction budget with conting nay of the Public Works project is $11953,525* 1 <br />ANKKr4Y KEL L AIRCHITECYS} P.A. <br />a21 Raymond Avanue, Suits 400 <br />Saint Paul. MinnesWla 55114 <br />