My WebLink
|
Help
|
About
|
Sign Out
Home
2003_0224_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_0224_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2011 11:50:11 AM
Creation date
10/24/2011 11:37:01 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM N01.0, X1. C. <br />Department, A,pprlolval,: Manager Reviewed, Agenda , <br />isd <br />g 1 1 ions and, ordering adv,ert' <br />Item Description: Resolution approvin plans and spec"ficat" isement for bids <br />for, 2003 Pavement Management Program (PMP) contracts, <br />Background,: On lTonday, February I Oi, 200�3, pu,bilic impirov,em,e,nt hearings were held for the 2003 <br />i <br />Pavement Management Program. Following the hean"ng's, the City, Council approved the construction of <br />each, of the proposied projects., The next step in the process is for the City Council to approve plans and <br />specificafions and authofize the advertisement for bids. The work proposed, for 200,31 is, as follows-, <br />P-03-iO2 Reconstruction <br />Neighborhood 6 <br />p# <br />Neighborhood 6111 <br />Victona Service Dr, Sandhurst Ave to dead end <br />Pineview Da,le Ct to cul-de-sac <br />A project location map is attached. <br />Poli,cily objectivesi* State statute requirels a Council, resolution approving, pilans, and specifications and <br />orden*n,g the advertisement for bids for all public improvements to be assessed. Sii,nce a, portion of the <br />2003 PMP costs will be assessed to benefiting properties, the adoption of this reisiolution is requirea tor <br />thel projects to pirocieed,. <br />F 6 <br />inancial 1"mpiications: In oirder to encolurag,e competitive bids and mi"ni"mize administrative costs, it is <br />desirable and practical to group, projects into one large constructi"on contract. All estimated project costs <br />4 <br />include Engineen"ng and contingencies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.