My WebLink
|
Help
|
About
|
Sign Out
Home
2003_0210_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_0210_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2011 11:56:57 AM
Creation date
10/24/2011 11:50:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ell Ell W <br />IF W W <br />W Z 4P <br />IWO 4WO <br />WO <br />Feasibility Report, acceptance was considered, 7/22/02: <br />As part of the project, Xcel Energy, has been requested, to, bury overhead power 1 ines <br />when possible- and will relocate twenty-four (24) distribution poles to accommodate <br />f -1 <br />road widening. A cl,ost share between the City and Xcel, Energy would be required for <br />any additional requested 1" mproveim,ents,. <br />Mr. Schwartzi further reviewed the Streetsica,ple port'llon • the Project. Mr. Schwartz <br />stated that several, options wiere included, as, previously directed, to enhance this <br />i <br />main thoroughfare of the Clity, considered the Cityls MaJ-n Street. In these <br />optiolons, the levels of sitreetscape design rangle from approxmately $626.,000 to $1.7 <br />a P <br />MiLilion, with ongioing maintenance estimated to range from $25,,000 to $5oo,00 <br />annually. <br />
The URL can be used to link to this page
Your browser does not support the video tag.