Laserfiche WebLink
Ell Ell W <br />IF W W <br />W Z 4P <br />IWO 4WO <br />WO <br />Feasibility Report, acceptance was considered, 7/22/02: <br />As part of the project, Xcel Energy, has been requested, to, bury overhead power 1 ines <br />when possible- and will relocate twenty-four (24) distribution poles to accommodate <br />f -1 <br />road widening. A cl,ost share between the City and Xcel, Energy would be required for <br />any additional requested 1" mproveim,ents,. <br />Mr. Schwartzi further reviewed the Streetsica,ple port'llon • the Project. Mr. Schwartz <br />stated that several, options wiere included, as, previously directed, to enhance this <br />i <br />main thoroughfare of the Clity, considered the Cityls MaJ-n Street. In these <br />optiolons, the levels of sitreetscape design rangle from approxmately $626.,000 to $1.7 <br />a P <br />MiLilion, with ongioing maintenance estimated to range from $25,,000 to $5oo,00 <br />annually. <br />