My WebLink
|
Help
|
About
|
Sign Out
Home
2003_0113_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_0113_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2011 1:01:11 PM
Creation date
10/24/2011 12:53:12 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WIN, <br />DATE-* 1/13/013 <br />ITEM, NO.,: / Y, 3 <br />Department Approval: Manager Reviewed: <br />Agenda, Secti'on: <br />F <br />1'ress <br />Item Description: Approval of'Policei and Public Works, Building Project Construction Manage- <br />ment" Services <br />Agency construction management is a combined, approach teaming, a, construction manager with tho <br />architec�t and the owner <br />d <br />g <br />uring plannffigi and, design. 1 he construction manaer and, the architect, <br />i 1 * <br />have separate contracts with the owner and sharie a, fiduciary responsibility, to the owner. <br />redly with the owner. <br />Dun"ng construction, the consftuction manager coordinates the trade contractors, and the construction <br />I 'fied by the architect and <br />activities and assists the architect in contract admim'stration. Quality as sped <br />owner, is, subject to the, daily, monitoring of the construction �manager's field team. <br />The role of the architect is essentially trad"t"onal., The presence of the construction manager provides <br />' r and construct" b ' <br />an, expert partner, during design, plamiing ion and rings a system of checks, and bal-i <br />a f%if <br />ances to, all, aspects of the project. <br />A,fter discussion with the architectural group we feel the agency construction management method ti <br />best suited to meet the overall ne�ed,s of thi s project. lt will provide the best opportunity, to deliver a <br />quality product meeting the many challenges including budget, value, and mffiimal disruption of day <br />to day operations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.