Laserfiche WebLink
IL ff. A". le% . tiffif <br />IM.Dreve %aa PI <br />August 18, 1993 <br />Page 2 <br />0 0 . <br />24, We made a $7,000.00 quantity extenisi,on error m the samtary sewer schedule. Our <br />estim,ate should have been higher., <br />3, The cost of the 30" and, 48" storm sewer and pipe aprons were, higher than <br />I <br />estimated, Estimated difference L'S about $3PO. <br />4, The, cost of the bituminous was generally about $4/lton more than our e sfi rm,te <br />e <br />reflectin M'Creasd e <br />mark <br />g t cost for, work this Fall., Esfimated difference i*si ablout <br />$9,860., <br />5, The cost of the concrete work was generally about 25% above our estimate <br />0 <br />reflectin eaW market cost for, work this Fall, Estimated difference-is, about <br />a Incr <br />$6,60011 <br />6. We, under estimated the cost of the.electrical feeder connftnflons for the, 'lighting <br />0 <br />system. Estimated difference Ls about $5,0004 <br />We belleeve that some of these 'Items reflect higher Fall costs for constructi,oin compar <br />to bids recieved this Spring and Summer. I <br />*ds, the City's <br />Based upon the rmew of these 'Items, the competitive groupffig of bi <br />familiarity with the contractor, and the urgency to, move forward mn'th the Arthur Street <br />Improvements, we recommend, award of this bid to T.,A. Schffsiky & Sons, Inc. in the <br />amount of $363,486.78. <br />0 <br />T,A, Schifsky & Sons is a contractor very familiar to the City of Roseville, havm' <br />competed numerous projects within the, city under public coin,tract. Their priopos <br />4 <br />subcontractors are as follows. <br />