Laserfiche WebLink
41 <br />(14) Contract for! construction of enclosure for, the 1633, Building central vacuum system <br />that will remain, until the unit is taken out olf'semce.1 <br />(1,5) Contract for construction of noise bam"er for 311,000 cfrn scrubber at the west, end of <br />0 the 1,633 Building. <br />(1,6) Order new exhaust blower to eliminate vibration frolm, the 3,000 cfm, scrubber near <br />the central vacuum system olf'the 1633 Building., <br />(1,7) Construct 22"1 high, sheet metals, barriers around three sides (except south) of th; <br />conderisor units on the 1633 Building. <br />(18) Equip all doors on the north side of the 16,313 and 1739 Buildings, mq'th Emergency <br />,Exit Only systerns, to prevent the unnecessary opening of doors. <br />171, q <br />-111iml L [411 R-3 01 PW!"111M)h <br />111 6 0 <br />Install two trash compactors with hydraulic units, inside the bul*l,dl*ng to eliminate, the <br />need for, open dumpsters, and therefore eliminate daily trash pickup.1 <br />(20) Increase parking capacity south - of the 17319 Bul'Iffing, to eli'rm'nate the need for 2nd <br />0 # <br />and 3rd shift (Mighttime) employees parking north, of'th,e 1633, and 1739 Buildings.1 <br />41 <br />�21) Purchase a new central vacuum system for the 163,31 Building (shm"lar, to the one cu,r'. <br />rently _used for the 17319 Building), once relocati I on, can occur following buiming <br />rni <br />modification.1 is, would replace the central vacuum system currently, being used, <br />for the 1633 Bufld' AI That, unit and its enclosure will be repilacied when the new <br />Ing <br />quieter unit is installed and, operating. <br />(22) Remove the air cooled compressor unit on the south side of the 1633 Building fol- <br />9 10 a 0 <br />lowing compieti,on of the building addition. <br />Noise du on Plan Page 2. <br />