My WebLink
|
Help
|
About
|
Sign Out
Home
2011-10-25_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2011
>
2011-10-25_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2011 8:51:43 AM
Creation date
10/25/2011 8:47:10 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
10/25/2011
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: October 25, 2011 Item No: 4 <br />Item Description: Communication Items <br />Projects update- <br />* Check for City Construction project updates at: www .cityofroseville.com/nroiects <br />0 2011 PMP- The Contractor has completed this project. <br />o Rosewood Neighborhood Drainage Improvements: The Contractor has <br />completed this project. <br />o Applewood Pointe -The Contractor placed the final lift of asphalt and is working <br />on punchlist items. <br />• Rice Street Project: For the most part the project has reached substantial <br />completion. All intersections are fully operational. Transit shelters are being <br />installed by others. <br />• Fairview Pathway (NE Suburban Campus Connector)- the Contractor has <br />completed the preliminary grading on the segment south of Roselawn and will be <br />paving the week of the 241'. The segment north of Roselawn will have the curb <br />installed the week of the 241, with the pathway base being prepared, anticipated <br />paving the week of the 31st <br />• Drainage Improvements- Staff is working on identifying segments to include in a <br />2012 drainage improvement project. <br />• Josephine Woods — Work started the week of October 101i, the contractor is <br />working on site grading with underground utilities to follow. <br />• Budget process update <br />• 2011 Street Improvements Map <br />• Other <br />Recommended Action: <br />None <br />Attachments: <br />A. 2012 Street Improvements Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.