Laserfiche WebLink
Change Order No. I <br />I Use afoam insulation in lieu of <br />specified DOW SM for rink subifloor <br />insulation <br />LS <br />2 U- bor for fink subfloor insulation <br />by others <br />LS <br />3 Brie transmission mains to be installed <br />in insulated trench in lieu of being <br />individually insulated <br />LS <br />4 Change refrigeration tubing in rink <br />floor, from 4 inch on-center (O.C.i) <br />spacing to 3-1/2 inch O.C. spacig <br />LIS, <br />5 Furnish & install Vilter 48 inch x 28 <br />foot, 2-pass, flooded ammonia chiller in <br />lieu of 48 11acb x 24 foot specified <br />LS <br />6 RevI substantial completion date to <br />November 22, 1993 and final completion <br />date to December 22, 1993 <br />LS <br />Total Change Order No. I - Add <br />42 2 -CH C()-1 <br />(-30000.00)1 (3,000.00) <br />(20$000.00) �.00) <br />111 (2010001.00) (209000.00i <br />459.560.00 4591.5(0.11 <br />1 1710501.00I 171050.00 <br />.01. <br />$191610.00 <br />