My WebLink
|
Help
|
About
|
Sign Out
Home
1993_0612_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1993
>
1993_0612_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2011 3:06:21 PM
Creation date
10/25/2011 2:53:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R-EQUEST O COUNCIL ACTION DATE: , <br />1 N Manager Revieweds <br />04004A'Ivw� M <br />Contractor, <br />• Bid <br />Alternate <br />` e <br />Total <br />Arkay Construction <br />y <br />i r 000 <br />' +� <br />27,000 <br />ECI Building <br />5051000 <br />10 ir 127 <br />27,434 <br />542!561 <br />KM Building <br />545,225 <br />291,000 <br />. <br />e MI _ _ _ <br />i <br />CM Construcit,i,on <br />6301500 <br />12,500 <br />27,500 <br />• 0 <br />For, the proji ect to be completed and operat i6onal to meet scheduled <br />dead,l lines , Olt is necessary for the contr,acit to be awarded at this time, <br />The lobby addition should be completed in, conjunction with the <br />6i 6i <br />m <br />3 1 . f NII <br />$610,000 for the basie blod. For the alternatesi the engineer's <br />estimatilei was $40,000 for Alternate 11,, the jumbo, brick, and $45,'000 for <br />Alternate 211, the elievator,, for a total net bid of $695,000. We are <br />Pleased to notei that all of the bidders were below the estimate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.