Laserfiche WebLink
00 <br />M,idY <br />a I IJL <br />XUr <br />rUJLJL,eL <br />E� <br />I U <br />' U <br />Lier <br />UQ <br />Ue i <br />J <br />l anu Ptac <br />does <br />not, <br />quire <br />plann <br />c ssion <br />review <br />or <br />publ <br />ic notice, <br />The <br />crude <br />EL11 ows <br />the <br />council <br />to <br />make <br />the <br />died. <br />s i on and <br />either <br />grant <br />or deny the <br />ar .ance <br />and impose <br />reasonable <br />conditions <br />on <br />the variance <br />Pollcy <br />obJectivesee <br />code provisions <br />apps. y <br />to <br />require <br />construction <br />operations <br />to <br />be conducted <br />during <br />normal <br />work <br />days <br />and minimize <br />the <br />d "stuurh'ance <br />of <br />existing <br />res <br />dent al <br />neig <br />orhoods <br />.. <br />However, <br />it has <br />alsc <br />been <br />city <br />policy <br />to allow <br />contractors <br />to <br />work <br />on weekends <br />and later <br />in <br />the-evening <br />on <br />weekdays <br />to <br />expedite <br />prof ects <br />. <br />n <br />the past, <br />the city <br />has <br />granted <br />variances <br />from <br />the <br />construction <br />activities <br />section <br />of the <br />code <br />to allow <br />work <br />outside, <br />c the <br />normal <br />limitation, <br />on <br />here <br />of operation <br />'inanc al <br />implications: <br />The <br />proposed variance <br />W15111, <br />have <br />no financial <br />.pact to <br />the <br />city. The <br />count's <br />construction <br />contract <br />stipulates <br />the <br />=ontractcr <br />may <br />work between <br />the hours <br />o <br />o0 <br />a.m. <br />and <br />p. ,, without <br />making <br />a <br />separate <br />distinction <br />for <br />weekend <br />activities. <br />. <br />ro <br />eat Schedulee <br />I <br />the <br />variance <br />is granted, <br />the <br />contractor <br />and <br />count <br />believe <br />the <br />pr'ol <br />ect can <br />he <br />cc <br />pl,eted <br />sooner <br />However, <br />the <br />extra two <br />hours <br />of <br />working <br />time <br />on Saturdays <br />will have <br />only <br />a minimal <br />imp' a+ t <br />on <br />the <br />overall <br />nroilect <br />'schedule, <br />