Laserfiche WebLink
[*A Cil 0 to] <br />41 41 11 <br />Ind irect system utilizing ammoniia, as pry me refrigerant, calcium <br />01 <br />chloride brine, as secondary refrigerant and plastic piping in <br />concrete f lo or, <br />01 <br />Based on refri gerat3Lni capacity of 865 ton and set up for future <br />additional capacity to • added,. <br />This will requirement management of ice to switch to bandy or <br />speed sk,a,tinig per schedule, <br />It,e,m <br />Cost <br />1. <br />Refrigeration system ,.& pumps* <br />650jOOO <br />2. <br />Concrete flooris in place, <br />250,000 <br />3. <br />Plastic, rink piping material <br />85, jr 00 0 <br />4. <br />Sand f ill <br />85,01000 <br />5a <br />Insulation and vapor barrier <br />96,000 <br />6. <br />Steel re bar and mesh <br />126,1000 <br />7. <br />subsoil heating (frost control) <br />60,000 <br />8. <br />Piping labor, <br />330, 000 <br />9I. <br />Supply and return piping mains <br />75j,000 <br />10 <br />0 JL- - <br />Crane,, rigging, mist. cos,L5, <br />258, OOO <br />1101 <br />Concrete forming <br />10 1 0 <br />120. <br />Evap-coind ens or in place <br />75,,000 <br />opinion of Probable Total Cost, <br />$ 2,100j,000 <br />01 <br />Based on refri gerat3Lni capacity of 865 ton and set up for future <br />additional capacity to • added,. <br />This will requirement management of ice to switch to bandy or <br />speed sk,a,tinig per schedule, <br />