Laserfiche WebLink
Mr,. Rick Jopike <br />,Iii lcitolber 2, 199�2 <br />Page Two <br />We, have 'incorporated into our 1993 budget the cost of thi's <br />0 <br />project. We are, confident of our ability to inietiate construction <br />during the early summer months of 19,911.3. d d. In fact, the blacktopping <br />and landscaping plans for thl's site limir our ability to evcn begin <br />. 41 <br />• el 11 <br />construction untiil mid-May, 193,'. <br />Win,tz companies continues to, use this site as a public <br />warehouse, as it has been, used, for a, number of years. This variance <br />is necessitated to iLncrease the maneuverability of the vehicles in <br />the lot withiout adversely a,f f ect ing the surroundi ng area or traf f ic <br />I a I <br />flow., We, have improved both the plari' mmg lot surface, as well as <br />the exterior of the building, to make the site more attractive. <br />Thank you for your coopleratil'on and assistance, <br />-r7LW. 3M <br />c�c,:� Mark J,, Ay,olt,te <br />