Laserfiche WebLink
ex St,elivei September I 24, 1992" <br />1 <br />IM <br />MI I i d Alternate #1 <br />id Alt _nate #1 included additional removals and gria,di ng work <br />for the pirelpiaria,tii on of the buiilding paid for the add,ition to <br />the exiisitling ice arena blu�il�d,iingo <br />Bid Alternate #2 <br />l� dl Alternate, 2� i rr� i Ruud d addition or deduction t the <br />total contract amount liff the <br />roi <br />t scheduilel, was delayed, <br />unt i 1 19931 <br />oft <br />• id Alternate <br />ii d! Alternate #31 included l thyl en t rm sewer pi�pe as an <br />alterna,te to the reilinforceld, concrete storm sew e+ r included, <br />the base bl d . <br />M Bid Alternate <br />Bid Alternate A included, an add*tion <br />disp�osal of ex,cessi common exicaviation materials. <br />11 t l m t slid' n i l r ec i rye from each contractor are follows. 0 <br />Contractor <br />Alto #1 <br />1 <br />A <br />Park Constructi on <br />$189675 <br />tiff <br />F.M. Frattalone <br />$159294,000 <br />0 * 010 <br />$169335s,00 <br />-$45jOOO*OO <br />Carl Bol a,nder, <br />$19,11794 *1 00 <br />+i$,29 9 010O a O�O <br />$,16 � 7610 a O�O <br />a-$22 0100 00 <br />Ashbach Construction <br />$21 9177101-710 <br />al 2,000.00 <br />$19,672.75 <br />-$30 000 00 <br />Arinti Coins truict, i on <br />$189295lo77 <br />w-$30 9, 00011, 00, <br />$212 9 28,2 v 0,0 <br />-$20 000 00, <br />Vellift and, Company <br />$21101 1 880. O�O <br />O�. OO <br />$22, 850 ei 00 <br />n-,$ 80 000 00 <br />Arcoin, Construction <br />$,23 912 2119 a, 00 <br />+$ 71500,*00 <br />$21,11,4950 <br />a-, $i47, 0100 Of <br />p r <br />