Laserfiche WebLink
P-IN.''EQUEST ® COUNCIL ACTION DATE** 6/08/92 <br />Department App Manager Reviewed: Agenda Section. <br />A F <br />Fr <br />A FF Reports and Recommendations <br />0 <br />Item, Description. Selection of Arch.1"teict/Encrineer for John Ros <br />Minnesota oval. <br />Backaround <br />To move aheald with the Speed Skating/Bandy facility, 'it is necessary to <br />select a consultant arch itect/ engineer to proceed with various tasks <br />it -0 0 6 <br />for the, project,, Various icolmponents requiring arcnitectural/engine6r ling <br />services include the followingS <br />the siel-ection of BRW as the Pri4m <br />• <br />John Rose Minnesota Oval, an <br />D negotiate • contract w ith BRW a <br />I. <br />recommends that BRW retain sub <br />support archi"tectural/engineerini <br />staff approval. <br />Approval of BRW as the prime arc nitecturial,/engineering design consultant <br />for the John Rose Minnesota Ova!,F and authorization to enter into a <br />4 IV <br />contract with, BRW toipirovide required design services, <br />I <br />