My WebLink
|
Help
|
About
|
Sign Out
Home
1992_0526_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1992
>
1992_0526_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2011 4:05:29 PM
Creation date
10/28/2011 3:51:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />mQUEST FOR COUNCIL ACTIONi DATE: 5/12MM <br />Fpii�epartment Aprr�,, <br />�yal: Manager, Revilewediii; <br />ITEM NO, <br />�i 40=1 I Ittl <br />74 <br />*I <br />It= DeSiCrOUe Approval of consulting engineering contracts for <br />Vi <br />1,992 uti,litv system improvements <br />MD <br />61 <br />Biackgroundial As part of the cs vie-year Capital Improvement <br />Pirolgra,m,, util ity system. 'improvements have been planned f or the water <br />16 lk <br />booster station and sanizary sewer lift stations. Improvements includ <br />renovating the pumps, an,d,r,eplacing electrical controls at the-110fit <br />stations and, pilping and pump, modific,ationsi at the booster station. <br />Piropoisalsi have been reciel"i'ved from the, consulting firm within our pool <br />who wei have determined to be tihe most qualified to complete these <br />projects, T'KDA of St. Paul,ia Copies of' the proposals are attached. <br />41 <br />Policy Objectives: Based on, past practice, 'lit is necessary for the colt <br />4 6 0 <br />council to approve consulting engineering contracts for construction <br />projects. The work proposed is consistent with the Capital Improvement <br />Program., I <br />41 <br />Financial Implilcations. Financing for these projects including the <br />design feesi outlined "in, the contracts, has been, provided in the 1992 <br />water and sewer operating budgets,. 'The proposed fees for these pro3ect <br />a is <br />including preliminary design, plans and specifications, and constructio <br />41 <br />observiat,lon are listed, as flol,lowso. <br />0 @ L. <br />Booster station pro3ect $9,300 <br />Sanitary sieweri lift station pro'gect $10,100 <br />Aft J <br />lol move ahead with the project, staff recommends <br />Stiaff Recommendat, laon: T <br />the council by motion approve the contracts and authorize execution by <br />appropriate city officials. <br />11pAllillillillillillillillill <br />Kotion alocepting authoriZation for engineering services for the sanitary <br />a 41 & <br />seweri lift station projlect,i City Project No. SS-92,=-20, and water booster <br />0 a 11 1 <br />stiation piping and pump modifications, City Project No. W-92-21, <br />
The URL can be used to link to this page
Your browser does not support the video tag.