Laserfiche WebLink
FMLtage. Developm,enit,,p Casie No . 2 2 4 4 <br />I at a S I I * <br />LOFIM <br />The issues involveld with the project at the March review were. <br />treatment of' the pondin,g area, visitior parking, and internal green <br />Is <br />space. All three isdues, were addriesseld 'in the revised plan at the <br />Apr 11, meet in,g . <br />Thell revised plan showed, Sweeney Piond preserved igntact,, with a <br />storm retention pond, proplosed in the northwest corner of the siLte <br />to treat runoff before it gets into the larger pond.. A trail was <br />proposed along the edge, of' the poind., <br />Surface parking is, moire <br />than requiried, by <br />Code, <br />and is placed <br />around the, site more or <br />less conveniently <br />to most <br />of the units, <br />The internal circulation, <br />was modified to <br />eliminate a driving <br />lanie ia,t the, east edge of <br />the sitie, This frees up <br />some space for <br />'more green area in the setback and, silleightly <br />larger <br />internal green <br />,areas as, well. <br />. — =a <br />