Laserfiche WebLink
fro is <br />4W Stieveni, Sarkoz,y, City Manager <br />M, kICI Steven. Public <br />► <br />4 Bob B3*.el,rscheid,i Parks, and Recreation Director <br />Re . ISSUES RELATING TO BANDYISPEED SKATING FACILITA. <br />D�atie: May 13, <br />Monday, At tihe work session on, s be discussing the status <br />Gi <br />of the bandy/spieled, skating facil"+xr, 'The foill, <br />owing is background <br />infourIfiation on several these Suggest <br />items ..® individually necessary, ask for <br />I <br />regarding proceeding elements design <br />1 01 Consultant.- . temam <br />Wie have been meeting and di sicussing the project with several <br />consultants. There are -three, design process. These inclu,de.1 <br />separatie, relating e <br />Site review <br />Recreation, i i master, Plan <br />col Design plains and, specifications, for ba,ndy/lspeed skating <br />a <br />For the f irst. m Ii <br />necessary <br />for the bandy/speed sik,atin,g facility and make a recommendat ion <br />regarding the moist feasible location for the, facility e two <br />sites to bei studied are county is iite at Larpentieur and Dale and the <br />sitiei immediately adjacent to the i,ce areina facili,ty, <br />