Laserfiche WebLink
Plage 3 <br />Steveln Sarkozy <br />592 <br />ay <br />me, 0 <br />a. Gralaing and site preparat ion contract <br />b. Building contract <br />c . Ice sheet/refrilgeration system contract . <br />0 <br />The grading and sitei preparation contract will include soil <br />A01 <br />correliczion, earth work removal of the existing roadway'. utility <br />instiallation and, rielloca,ti,on, and the design, and construction of <br />dial 11 <br />necessary drainage filaciolizies, <br />The building contract will 'involve construction of required locker. <br />rooms and storage facilities. Issues to be addressed wi011 include <br />adidill"itigonal future space needs to be 'included in this facility at <br />this, time as well as whether to attach, this facility to the <br />exist"nig ice arena and provide for the possibility of covering the <br />01 01 <br />i1ce sheet in the future., <br />81 <br />e actual <br />. <br />The f inal contract w ill involve the construction of th ic 9p, izi <br />6 <br />sheet and refrigeration systemsi,. Thils will include the <br />installation of the piping for the refri,geriation, the pumps and <br />compressior systems, and necessary pavement and turf over the <br />rief rigeration, equipment,. <br />For the t�otal priojeict to successfully II of the design and <br />planning activil"ties must be done simultaneouslyiiiii, A tentative <br />schedule of the various, activities including design and <br />0 <br />construction activities, isi outlined as, follows: <br />a. Site review <br />it is suggested that independent, Consulting Engineers, Inc. <br />be rietaiLned to begilin the site review process. If the council <br />agreesi at the work session, to retain this firm and formally <br />