My WebLink
|
Help
|
About
|
Sign Out
Home
1992_0420_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1992
>
1992_0420_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2011 12:53:11 PM
Creation date
10/31/2011 12:47:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />C -:ice <br />REQUEST' FOR COUNCIL ACTION DATE 4/13/9'q- <br />Department App;Wal: Manager Reviewed,: <br />:A If 0 <br />It= Description: Authorization for feasibility study examining'leaf <br />compbsting operation <br />We have, rece iliviled. several comments, and complaints from nature center <br />uslers regarding the appearance of the siil'te,.i Also, concerns were <br />expressied about potential water pollution from organic materials running <br />off 111 the composit. piles. <br />Accordingly, staff feels it is appropriate to have, an outside exper <br />examine the, operation to determine the following., <br />1. Whether the site is adequate tol meet our needs for futur�-� <br />continuation, of the leaf program <br />2�,. Analyze the current compostingi operation <br />3. Analyze curreint program costs, <br />Well soil icited. proposals from outside consulting engiineering firm's to <br />@1 6 <br />assist in thisi study. We have found that the f irm of Orr, Schelen, <br />rZayeron,i and, Associates, In,c* (OSM)l of Minneapolis is xost qualified to <br />comiDilete. tihe, study,, A copy, of' their proplosal is attached,, <br />�i <br />
The URL can be used to link to this page
Your browser does not support the video tag.