Laserfiche WebLink
0 <br />CI* ty lim "Its. The construction includes new f acil it 1'es an� <br />removal salvaging, reconnecti,on and relocation of ol(O <br />I I <br />facilit ies 0 <br />All, of the bikie trail construction to be perf ormed along the <br />west side"' of Trunk Highway No. 4,9 (Rice Street) f rom the <br />McCarriIii n's Park entr,,ance (approximately Engineer Station 34+00) <br />to County Road B (lapproximately Engineer Station 71+50) withi <br />106 <br />the corporate City, limits. The construction includes a <br />bitumi,nousi surface and its aggregate base, <br />4, 0 Percent <br />ID <br />i's All, of the concrete curb and gutter construction and all of the <br />6 <br />