Laserfiche WebLink
12 Transit Hubs <br />9 Large Regional Park/Ride Lots (300-500 spaces) <br />2-3 Bus,Layover Facilities <br />The 12 new and 5 eidsting transit hubs will, become the focal points, of the transil"t system.1 They will <br />" of the <br />provide cla,te�-contr�olledi, convenient transfer opportunities among fferent components the di <br />system. <br />i 0 1 <br />The bus layover faciRties Wi*11 'improve bus, operations in the, downtowns, areas. <br />Estimated, capital cost: $2,1.,0 million <br />"'Team Transit" Projects <br />fil 01 "th Mn/DOT, RTB and th <br />An coo-pei 1 wi <br />This program, has been launched recently by the MTCi rat on <br />Metropolitan Councill. It consists of small, wnstruction, projects that can be implemented almos <br />a <br />immediately to, provide travel time advantage and, reliabi ity to transit vehicles. Projects approved fo <br />1992 include-. 31 <br />Har p *ects, such, as shoulder lanes, on portions, of I-35'W Sovy T.H. 61, T.H�. 4i7 and T.H, <br />t. ther, sinn roj <br />Mi We lots and bus, stop <br />-t-onal ramp meter bypasses, expansii,on, of existing park n improvements <br />v5, addl 1 <br />e currently under evaluation by Mn/DOT- <br />A <br />These projects, of cti"tical importance to bus operations 'in downtown St., Paul,, would be i Pie ente <br />t t <br />in connection vA,th' other severa,l temporary projects to provide preferential treatment t <br />a <br />multioccupancy vehiciles, during 1992 constructi'on activities 'in the I-94/1-35E commons sectioi <br />The Team Transit program is, expected to be implemented *in a large part, by Mn/DO,T as part of thi.z- <br />Ct-9 <br />ongoing management of the metropolitan highway system. It wiU 'Include, however, other projec- <br />a, <br />