Laserfiche WebLink
March 120 1992 <br />r <br />V' • <br />ti <br />M <br />As reques,ted by the City Council # we have, contacted refuse <br />haulers to, determine the costs associated Clean <br />Event and the fee schedule if residents were res,poinsibile for the <br />actual coistis, of disposals, <br />Attached is a copy of the proposal, set, forth by Keith Krup <br />primary and his associates who were the <br />used, aro All accounts work <br />following <br />the, Clean Slwe�ep Event: <br />Tr °• Cerat <br />*If we substitute Loaders and Operators, from the Public Works <br />D imrtment, for, those provided p Sons, <br />elizinate the $17004.00 cost and, substitute - followinge <br />Fuel, 50000 <br />Maintenance Worker Salaries 569401Q <br />Total $ 610.1 0 I� <br />Plus Other Costs (above) IN <br />OPTION#2 TOTAL $1 r 565,11 m 0 <br />we have made <br />Fairgrounds, for Saturday, d <br />decision m the City Council as soon as possible • that <br />solidify date and other arrangleMentso <br />