My WebLink
|
Help
|
About
|
Sign Out
Home
1992_0225_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1992
>
1992_0225_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2011 2:17:58 PM
Creation date
10/31/2011 2:17:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T. COMCIL ACTXON DATE low 2/ <br />Fl.,epartment Ap�p Manager Reviewed: <br />tm Diesierliptione Public Improvement i - -1 <br />ITEM N <br />al <br />Background,, In J'uly,, the city, council selected neighborhoods for the <br />3.99211 it P n i ordered - preparation o I feasibility s i <br />piroj�ectsi. On, January 21117,, 1,99211,, the council ordered public hearings. <br />Publichearings wiill be held February 25,, 1992, for the following <br />1 9I NeiLahborhood - * --and -90�11 Street and <br />from, storm, sewer for Hei,nel Drive Boulevard to end of <br /># Heinel Circle m <br />P-92-02, NeRrhborhiolod 73 and SIT-92-12 Street reconstruction for <br />McCarrions Street, Rice Street to Shady Beach; Shady <br />McCaririon,s Street to Center Street; and Wagner Place,, McCarrons <br />Street to Shady Bleach. <br />
The URL can be used to link to this page
Your browser does not support the video tag.