My WebLink
|
Help
|
About
|
Sign Out
Home
1991_1028_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1991
>
1991_1028_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2011 1:42:34 PM
Creation date
11/1/2011 1:33:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR COUNCIL ACTION DATE: 10-28-91 <br />ITEM NO, <br />Pon- # # # w <br />a F - <br />WAro M-trit FW; <br />- N&I <br />Ia <br />11 <br />item, Descr iption: Cal, ibre R, idge Partnership request f or general <br />1W- <br />concept st,agie, PUD approval,, and rezoning from <br />R-3A and R-1 to PUD at 2231 Rice Street. <br />0, I 0 1 1 1 <br />The City has previously a,pipirolveld a 73 unit apartment proj ec <br />for this, site,.l A building permit has been taken out to allo <br />that development to occur,,, I <br />201 Calibre Ridgle Partnership (Duffy Development and Twin Cities <br />Housing Corporation) have decided to reconsider development <br />concept for the site. The revised proposal allows a 58 unit <br />two-story townhouse concept for the site rather than the 73 <br />it 3i-is,toriy a,pla,rt,ment, <br />uni <br />0 1 <br />3 The Planning Commission, on a 6-0-1 vote, with Commissioner <br />Harms, abstaining, recommends approval of Calibre Ridge <br />Partnership request for general concept planned PUD approval <br />and, rezoning from, R-3A and R-1 to PUD with the following <br />clonditions.1 <br />A- - <br />a. 'That the applicant satilisfy requiremeni.5 of the Cit <br />0 <br />Engineer, regarding the sanitary sewer 1 mine and easement <br />.W <br />through the, p,rioperty, includ ing the proper vacation an <br />diedic,at i'Llon of easements as required. I <br />b, That staff approve the site plan and landscaping plan if <br />a <br />they are, modi"ifiled as a, result of the above Engineering <br />considerations,. <br />a <br />c 46, That the plans be revised to show a no tra 1*1 connection <br />to the west connecting to, Marion Street . <br />d That staf f approve, the detailed design of the pla' <br />areas The blasketball court should be relocated so a <br />11 <br />to not be ad,j'acent to the residential neighbors to th <br />west .1 1) 1 <br />1 0 <br />le That the construction and provision of parking spaces <br />lands clap i,ng trail system, and play areas, as require' <br />by, the PUD ordinance , proceed at the same rate as th <br />construct 'ion, of the townhouse units themselves if thl <br />
The URL can be used to link to this page
Your browser does not support the video tag.