My WebLink
|
Help
|
About
|
Sign Out
Home
1991_1028_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1991
>
1991_1028_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2011 1:42:34 PM
Creation date
11/1/2011 1:33:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pi <br />Callbre Riodge Pa,rtn,ershipi, Case NOe 2355 Page 11 <br />0 6i <br />The re'sult, we believe,, is a project that meets the test of <br />Mi 9 <br />i.mproving the neighborhood compared, ■ the prevl*ously approved <br />0 <br />project,, and of improving the character and livability of the <br />t,ownhomes, themselves, for the future fames who wi*11 call it homellip <br />Therefore,, we recommend approval of' the General Concept Stage PUD <br />a <br />for Callebre RI'dige, Tow,nh,ome,s, subject to the following condiLti"Lons. <br />1) That the appliciant. satisfy requirements of the Cloti <br />enginelleilr reg,iarlding the sanitary sewer line and easement <br />I- - <br />through the, properity, including the proper vacation an <br />Mi <br />tedication of eiaslements as required. <br />2") That the City Planner approve the site plan and landscape <br />plan 'if they are modif i4ed as a result of the above <br />Ii 0 -61 a <br />,engineering cons icterat ions. <br />3) That the plans be reviseld to show no trail connection till <br />41 <br />the west connecting with Marion Street,, <br />4,) That, the City Planner approve the detailed design of th <br />f7vlay areas. <br />requi"red by the PUD or'd,inance,, that the construction <br />and provision of parking spaces,, landscaping,, trail system,, <br />and play areas proceed at the, same rate as the construction <br />of' the townhouse units themselves, if the project is to be <br />constructed in phasies,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.