My WebLink
|
Help
|
About
|
Sign Out
Home
1991_1216_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1991
>
1991_1216_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2011 11:30:52 AM
Creation date
11/2/2011 11:18:08 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase I This report suggests that, the School District approach the <br />planning for the- physical. facilities as a two phase project over <br />the next 15'� ears. Phase I addresses three areas which we call <br />Ii y <br />Mwntenanice, Alterations, and Enlargement and are the separate <br />I <br />areas covered by, the estimates. <br />Main,tein,ance is the attention required by the school's age and <br />9 <br />condition. This refers to roofing, mechanical systems, wall <br />systems, M"sulation, Ughting, et,c4i <br />13010 <br />1200, <br />1100 <br />900 <br />Soo <br />700 <br />600 <br />871- W 891. 910., 91. 920 9x 1 94- 95- 96. <br />89 89 10, 911 Jr. 93 94 95 96 91 <br />3CbW Year <br />Now Enrallmomts for 92.97 in pmjoaed <br />We believe, ifftase I is accomplished, it positions Rosevffle <br />well ('aftier abouit 3-,5 yearis of construction) to look to the future <br />to develop the facilities wlAch,, due to the Phase I remodeling, <br />will be more f1e)(ible and morle accommodating to educational <br />ob 0 ectives. <br />J <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.