Laserfiche WebLink
I Do 0 1 31AA, <br />Preliminary Construction Budget Estimatez <br />Dece.m,beir, 19191 <br />FARM MW U73t. <br />AlternatiNe- A <br />Frremolition & sitew,ork (308 cars) 3 2 5 1 0 L, f <br />I VON 111 <br />New, Building <br />upper level, 00 S.F'. @ $80/S-F* 216,40�0100 <br />lower level, 10,,000 S.F. $,50/s.F., -.5,003QM <br />3)11401,0010 <br />MP- <br />Option to add 6,000 S.F. to east @ $80/S&,F* MPP- 48IO9,M <br />Demolition and sitework, (2i58 cars) 250,000 <br />