Laserfiche WebLink
110olloicy Objecitilives: The various street reconstruction or construction <br />projects-are being considered as part of the city"s 1991 Pavement <br />Management Progirame The projects are consistent with the policies <br />originally established for the PMP,, These include the following, <br />Roads wl*,ll be reconstructed based, upion pavement evaluation process <br />and reconstruction will be done by neighborhoods <br />T <br />11 C Tq <br />-*-M�lo <br />0 1 ki[4 <br />61 9 6 <br />Adoption of resolutions receiving feasib ility reports and scheduling <br />improvement hearings, for January 28 and 29, 1991, for the improvement <br />proij ects as, floIllows <br />Januarv-28 <br />P-91-021 , Neighborhood, 56 <br />P-91-02 r Ne ighborhlood 168 <br />ST-91-108 Neighborhood 6i-2 <br />4 gyp, r <br />P-o-91-02, <br />Neighborhood 44W <br />ST-191-09, <br />Neighborhood 44W <br />P-191-02, <br />Nel'ghborhood 45 <br />911-10, <br />Neighborhood • <br />P-91-02, <br />Neighborhood 57 <br />P-911-1013, <br />Neighborhood 57, Skillman <br />P-91,-1014, <br />Terrace Drive <br />