Laserfiche WebLink
17 The City shall own and maintain the sanitary sewer and <br />watermaIn systems, within, the Clot y.1 <br />-1,8. The City shall, pay 100% of the cost of concrete an <br />b3L tUM:1Lnous d,ri,vieway pavement riemiovia,l and replacement (private) a <br />i f 0 <br />identified in thiie piliains and speci ications,* <br />19 6i The County shall. pay 10�O�% of the, cost of concrete retainin <br />wall, clICI ins,tructeld north of Engineers station 5+00 to 11+oo for th <br />protection of existing buildings. I <br />20,. The City shall pay 75,% and the County shall pay th <br />remng, 25% of the cost of masionry retaining walls constructe <br />Gi <br />souith, of Eng3".nieers Station, 51+iOO to 53+00 in liieu • <br />of slope easementsi, <br />" 21,. The City shall, p�ay 75i% and the County shall pay the <br />remag the cost of the elev,en foot parking lakne on the <br />0 61 <br />siouth side between Enginelers Station 12+60 and 48+25a These pay <br />iitiemsi arle i,dentified 'in the Statement of Estimated Quantities Ramsey <br />Clounitiyi/Clity olf R,oselville co l,umn wi,th a footnote marked <br />22.i Any City improvements to those provisions presently made in <br />the, plans, and specifications may, be in,coir,porat,ed in the construction <br />clontir,act by supplemental agreement approved by the City and shall be <br />i,vaid for as &peicified in the supplemental aigreelment. <br />2 3 al The City shall pay ten pericent, (1,0 e of the <br />construction cost less, the cost of sanitary sewer improvements, as <br />tietiermineld, by the contract, as awardied, to the County as a preliminary <br />engineering f'lee., <br />®I City shall pay two percent, (2,%) of the construction <br />cost of the sanitary sewer improvements as determined by the <br />contract. as awarded, to the, C'olunty as a preliminary engineering <br />1i <br />(admin,istrative), fee. <br />2510 . e prell".1minary engineering fees sha,ll be due upon award • <br />the construicon contract. and are iin add" - tioin to and not in I imeu of <br />the 8% and 2% construction engineeringi fee, identified in paragraph 27 <br />Oi <br />ind 28 of thi& agrelement, <br />269 #r cost of the 'i-anitary sewer improvement is <br />the sium-,of Item 210 4*509 Remove Manholes and Catch Basins plus Items <br />2,510 11 thru. 05103.603 and Item 10510 .,605 2111 Polystyrene Insulation <br />shown 'Ion, the, City of Roseville column of the Statement of Estimated <br />Qua <br />27. The Cli,ty shall pay eight percent, (8%) of its share of the <br />ruc <br />ons n o e <br />cittio cst, lss the <br />'a cost Of City utility extensions or <br />im, rovemen <br />P tst as deltermi,ned by the, f inal, contract amounts, to the <br />County as a construction engineering feie. Th 'Is fee shall be due <br />V bi <br />upon notification t,o the Ci,ty of the, fi,nal amounts of the contract. <br />21 8 The, City shiiall pay two percent (2,%) of the construct' <br />ion <br />cost of the City uti-lity extensions or im,pirolvelments, as determined by <br />the final ciontract amounts, to the County as a construction <br />11 <br />engiineerii,n,g (administriation and surveying) feel. <br />