My WebLink
|
Help
|
About
|
Sign Out
Home
1991_0128_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1991
>
1991_0128_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2011 3:49:33 PM
Creation date
11/2/2011 3:37:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page, 2 <br />Public Hearings <br />8/'91 <br />As the summary table isndiciates,, the total estimated construction costs <br />for all work including Ramsey County p,roj�ects is estimated to be <br />apiproixi,m,ately $3,000,000., Local streets are estimated to cost <br />$2,i8OO,iOOO. To stay within financial igiuidelines, it is suggested that <br />approximately, $6100,000 to $800,000 be dropped from the 1991 program, <br />We, have evaluated each ' neighborhood based on pavement condition an <br />,other factors and have, priorJ-tized then as follows with the first <br />neighborhood being, the most crucial, tio completes I <br />SI it 0 if <br />masied on tih 'is raring, and, available f in,ancing, we recommend Neighborhoof <br />,571 'be removed from the 191911 program. The council memo for the January <br />29 hearing wl"11 discuss this item in, greater detail. <br />Schedule: For projects loirdered at 'the January 28 and 29 public <br />0 <br />hearings, we suggest, the following schedulieS <br />January 28 March 8i comT.Aetion of f inal construct, on plans <br />and spielcif Iciations <br />
The URL can be used to link to this page
Your browser does not support the video tag.