My WebLink
|
Help
|
About
|
Sign Out
Home
1991_0129_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1991
>
1991_0129_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2011 3:39:19 PM
Creation date
11/2/2011 3:38:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ff--age 2 <br />ff ,ubl, ic Hearings <br />1/29/911 <br />As, the summary table indicates, the tioltial estimated construction costs <br />for, all, work including Ramsey County proj�ects 'i's estimated to be <br />If tely, $3,00,000. Local strets are estited t• cost <br />ap proxi ma 0 e ma o <br />$2,800,0000 IT�ol stay within financial, guidelines, it is suggested that <br />9 <br />approximately $600,000 to $800,000 be dropped from the 1991 program. <br />We have eva,luatied each neighborhood, ba,sieid on pavement condition and <br />other, factors and have prioril"tized them as follows with the f lOrst <br />"I <br />ne1cffiblorhood being the most crucial to complete: <br />.ff <br />I <br />We recommend that the,, lowest priority neighborhood Neighborhood 57, be <br />*1 IN <br />delayed. However, rather, than dropping this neighborhood from the <br />program and rehearing it at, a future date, we suggest that the council <br />4 <br />consideri ordering Neitthborhood 57 for, construction sometime during the <br />.W <br />next 1,8 months.1 Chapter 429 allows the council to order an improvement <br />
The URL can be used to link to this page
Your browser does not support the video tag.