Laserfiche WebLink
I fir <br />or. I <br />^1 <br />fae, o rge W * J oh ins o n <br />Res ume <br />Page 2 <br />lb <br />VI. Exper ience (C,ion" • <br />1970- Kehn e Electric Col, Inc, <br />1984 2124 University Ave,,, St. Paul MWe <br />Position: Executive Vii ce,President Chief Engineer <br />Responsi ' bilities: Supervision of estim i <br />ating, en ng, and gen�eral <br />operations, of the compan►., <br />OP <br />Report to: President of the Company, <br />1968- Departm�ent, of Administration <br />1970 State of M�i nn�es,olta, St. Paul MN <br />A <br />1958- Department of Administration <br />[968 State of M�inn�esota, St,, Pa,ul�, MW, <br />I 11J <br />Posioltion.: Administrative Engineer <br />Res pon�s <br />i ii les-, Electrical Engineer, for tihe Sitate Building Programs; <br />also advisor to the Commissioner of Administration on electrical matters <br />Report tole <br />0 State Architectural Engineer <br />1952- Kehne Electric Co., Inc. <br />19 56 722 Ray,monod Ave, . I St. Pauil MN <br />Position: Estimator -� Engi neer <br /># # M <br />Responsibil 1 1 t 1 1 esial Estimate and manage,, electrical projects for, the <br />company; a so responsi le for some design - bmild projects. <br />Report to: Chief Estimat r <br />19511- General Electric Co., Schnec, tad y', N,Yl. <br />1952 Pos i ti ion: Test En�gi i neer <br />Res pons i bil i ti es: Test, various Products m de by the company includi ng <br />steam and gas, turbines, <br />Report too. Test Enigh veer Supeirvi ri <br />