Laserfiche WebLink
6 'To make, improvements based on the most up-to-datz <br />professional standards,. <br />a <br />'7 To, reduce, the current maintenance requirements throu <br />redesigning certain elements of some parks and th <br />g <br />installation of quality, durable, vandal-resistann <br />0 <br />,materials <br />PI, PRINCIPUS OF REDEVEWPMENA <br />All 'improvements Will meet the latest appropriate safet <br />requi,riie,mle,nts,.,raunic*lpaI and state codes and professiona <br />standards . I <br />4 0 <br />2,, Staff will, work with the Parks and Recreation Commissio <br />4 1 4 <br />in, completing and revisewing the PIP • o a <br />evalutin,. Stf <br />a -1 <br />propose redevelopment projects to be reviewed b-N.. <br />wi <br />IMlanning, staff/consultantsi and presented to City council <br />3,- Improvements will be designed to meet required standard <br />and minimize and/or reduce maintenance procedure <br />curriently required. I <br />6 <br />440 'The majority of the reconstruction labor will be <br />contracted allowing park maintenance staf f to concentrate on regular maintenance concerns, <br />a <br />An envirioninental assessment will be conducted before a <br />redevelopment proposal is completed. <br />6e A neighborhood meeting will, be held to explain all <br />S <br />improvements S <br />7 Standard, procedures will, be used f or draw ing <br />0 0 6 <br />specif iciations, advertising for bids and awarding <br />contracts, <br />Lb d <br />2*i PIP evaluation instrument is refined. December <br />3a PIP scores are obtained for all Roseville <br />parks and park a,raen iti es's February 1 <br />