Laserfiche WebLink
Rick Jopke <br />Minnesota I/M Program <br />Emissions Testing Facility <br />January 17, 1991 <br />Page 2 <br />b. The planting details have been amended as per your comments. <br />C. The size of the Black Hills Spruce has been increased from 5' to 8', <br />3. Engineering Considerations: <br />Item 1. Systems Control will take care of assessment changes. <br />Item 2. A concrete sidewalk is shown to be added at the north end of the <br />Systems Control site but not at the adjoining outlot. The client <br />feels that this should be the responsibility of the party that develops t <br />the outlot. <br />Item 3. Sunde Engineering has indicated a new catch basin in the driveway. <br />Item 4. Systems Control is working to obtain an easement with Minnesota <br />Transfer. <br />Item 5. The connection to the existing 72" storm sewer and the extension <br />of a storm sewer stub to the edge of the outlot are two issues <br />which I don't think have been fully resolved at this time. <br />Item 6. Silt fence details are shown on the grading and drainage plan. <br />Item 7. A note has been placed on the architectural site plan regarding <br />removal of the fuel tank and any contaminated soils. <br />Item 8. Sunde Engineering has indicated on their drawing that the existing <br />4" water service be turned off at the main. The new 6" service will <br />meet Ramsey County standards. <br />4. The trash enclosure will be constructed of face brick to match the building <br />facade. <br />Thank you for help in this matter. If you have any further questions or comments, <br />please give me a call. <br />Very truly yours, <br />PE ASSOqATEJ INC. <br />�I <br />Jerry B. P rk ns, A.I.A. <br />/kup <br />