Laserfiche WebLink
City of Roseville <br />December 28, 1990 <br />Page 2 <br />The developer will work with Minnesota Transfer Railroad to obtain the necessary <br />easement for the pipe which connects into Roseville's 72 -inch storm sewer pipe near the <br />southeast comer of the proposed emission control site. <br />6.) As requested by City Staff, an additional 4.5 feet of right -of -way is to be dedicated along <br />County Road "C" so that there will be a 49.5 foot right -of -way from the centerline of <br />County Road "C" which is the north line of Section 8. There currently exists a 6 foot <br />high cyclone fence on the subject property. The applicant requests that a provision be <br />made so that this fence will not have to be moved from its current location until such time <br />as improvements in County Road "C" are made. Any relocation of the fence due to this <br />additional right -of -way dedication should not be at the expense of the property owner. <br />The owner also requests that should the additional right -of -way dedication for County <br />Road "C" cause the existing building to be closer than the required setback and that a <br />variance be granted by City of Roseville to accommodate the existing building. <br />Respectfully submitted for: <br />Meam Properties, Inc. <br />E.F.J. Partnership <br />Systems Control <br />By: Sunde Land Surveying, Inc. <br />PJohn 4KBarf <br />Sr. Vice President/Office Manager <br />jb2 /jh /rosevl <br />