Laserfiche WebLink
"QUESIT FlOiR COWCIL ACTION <br />I DATE** 4/23/9J <br />Department App,,Yiiqva,l Manager Reviewed: <br />di <br />item Deser341.ption: Award of bid, 1990 Contract C <br />I. <br />Agenda Sect i9on. <br />Reports and <br />• <br />Re c omye <br />I <br />For, this proj ect weil received, e ight extremely compet 'it give b 'Ids. The bi ds <br />41 <br />ranged from a low of 1$784,,66,4..29 to a high of $1,185,087.91. The <br />engineer's estimate for the project was $9910,,000. The low bid of T. As <br />I F - <br />Schl"ifsky, and Sons is, approximately 211% or $,205,,000 below the engineer-s <br />estimates The biods received are 11"isted in ascending order based on bid <br />0 a <br />price in, the resioluti ion for, council cons iderat <br />