Laserfiche WebLink
M 114, 11 <br />Thiis.. file deals with a speicial use permit at the corner of T..H,. 36 an <br />41 1 <br />R,ice Street. The leng ineering staf f has reviewed this proposal and ha <br />the follow ing, recommendations <br />7. Care must, be, taken at construction, time to protect for erosion. <br />SJ.lt fencing and hay bails must be used. An erosion control plan <br />I <br />is, needed as part of the building permit approval. <br />0 a <br />8. Inspection, by an engineering firm is required for all utility <br />mains installed on, the site. As-builts of the mains will have to <br />be . provided within 30 days after completion of work. Testiong for <br />the mains, will have, to be approved by the City of Roseville's <br />staf f a, <br />I "liitiy plan $is needed as part of the site plan approvalv <br />3 A, uti <br />Add itional concerns, may arise af -ter rev ilew of those plans'. <br />