Laserfiche WebLink
Page 2 <br />P-90-16 <br />&I LZ L L 1' L <br />In order tio proceed with the publi*c improvement process, since the <br />,original pro"ect. was canceled,, a new feiasibisli&ty report must be <br />generated and considered by city council, it is proposed to have one of <br />the, cs consulting engineerst, SEHI, complete the feasibility study. <br />VzW141O)OZOW1,161:4 Is I -0OU6 zip <br />Approval of resolution ordering preparation, of feasl'bl'lity report on <br />Gi <br />improvement P-190-16, Lincoln Dri*ve and County Road C-2 roadway <br />al <br />,improvements,. <br />