(Dellwood.Ave,) property I I
<br />than the garag.e of our
<br />neighbor to the siouth,,, Ou,r Proploseld garage would be
<br />further inside our rear property li'mine than our nel'qhbo
<br />on the west, side of Deillwood Ave.
<br />c We current I y own 2 care and, a c�o I I eci�or car and are
<br />likely to own, three claris !in, the foreseeable future. We
<br />have I lived at thIs address for almost 19 years and wish
<br />'to maintain a eat appeariance and, have the cars parked
<br />under coverl
<br />d. Our Intention Is to clonstrucit tihei Proposed citarage
<br />withi a hip roof to coordinate with the architecture
<br />of our, home,,
<br />We have, been working with, a. lan�dscape architect to
<br />intiegra,te, the propiloseld ga,ra,ae with, the existinq
<br />rie,s i dence .
<br />I
<br />After ',hav I n,g examill, ned the ne ii gh,borhood, we be 1 1 eve
<br />that we ar,ei asking for, something which 'is already
<br />enlJolved by, a large number of homes, in, the area, that
<br />isi -
<br />buildinc -is constructed closer to the Property e,
<br />than, 30 felet.
<br />ig,. We had originially clons,id,leired, requesting a variance
<br />to construct a, double garacre at tihe same spot on the
<br />property but.felt, that It would be t,00 close to the
<br />properity, I in,el.
<br />11
<br />tt PLEASE DISCUSS THE CURRENT AND PROPOSED DRAINAGE
<br />SITUATION AND WHAT' PROVISIONS ARE BEINiG MADE FOR
<br />THE APPROPRIATE UT'I-LI'TIES.
<br />a. There are, no ciur,r,en,t difficulties with drainage on
<br />th,e, Property and we do not anticipate any drainage
<br />dif f Icul tiles t,he proposed paraael is -construct-
<br />ed.
<br />b. We P I an on prov I d I
<br />Ing electric utilities to the
<br />proposed ga,ra,ge from our curr-ent residence.
<br />1
<br />9_,ji DEPENDING O�N THE SCAiLE- OF PROJECT, ADDITIONAL ANALYSIS
<br />RELATING TO MARKET, PARKINGpi-TRAFFIC., SECURITY, ETC.
<br />MAY BE REQUIRED.
<br />While wei do niot bellevie that the 15ma,l�l size of the
<br />orc,Ject necessitates anvi additlional, analysis at this
<br />point,i we would be, happy to answer any questions which
<br />the City milght have about the Proposed pro.Jeciti,
<br />104 HOW IS 'TRASH' GOING TO BE HANDLED? WHAT TYPE OF TRASr_1
<br />ENCLOSURE WILL BE PROVIDED? I
<br />We antlici;Datel n,o trash problems caused by the pr-opo5ed
<br />
|