Laserfiche WebLink
nat e July 1, 2 1,99 0 <br />M1 61 & 0 <br />First 1' ti 'is necessary to prov ilde d,ef initions to better understand <br />0 a <br />t.1t,e te7iunsi used loin tX. "is dlSiCUS S 107F,,. Vtl ese are a s fol 1 ovs <br />3o Contract Cost. Overruns -- Additional work involving <br />increased contract quanes, beyond the quant it ies <br />contained, in the original contract bid proposal. Cost <br />overruns are normal, S <br />As an example, a,ssiume a city construction pr03ect includes the <br />01 <br />installatiLon of a, small, sitorm sewer system across an open parcel <br />of land,. If a manhole was needed to be added to the pipe system <br />W <br />that was not originally shown on the plan, this addition would be <br />a chiange. order.1 If the open area was to be paved,, which i's a <br />