Laserfiche WebLink
,Ge�,rald K. Richardsi (Olive Glardeni), Case N�o.1 21071 <br />Buil - MateriaLl <br />UMIM <br />As part <br />of' the <br />redesign process, <br />the applicants have changed the <br />exterior <br />building <br />matiels. Ais Sheet <br />A-2 il,lu�stra,tells, the principal <br />exterior <br />material <br />isi now brick venieer,., Although they have not selected <br />the final <br />collors, <br />we have Informed <br />them that the Pla,n�ning Commission <br />and City <br />Council <br />like the dark brick <br />tones that, are present in t,he area. <br />They stated that <br />they would address <br />this isslue at the meetin�g�. <br />A standing seam meit,al roof 'is sholwn along the front and, two-thirds. of <br />the side eleivationsil. This metal roof is located above the, ca,nopy, which <br />we under,stand will be a dark green color. The location of the canopy <br />is, shown in Plan view on Sheet, <br />The use of stucco has been, 11mited, to, the area immediately above t,h(; <br />m, entrance <br />ain . See the front elev-ation an Sheelt A-2. <br />Another improvement 'in the, proposed plans is the inclusion of a triash <br />handling, area within the building. The location of t,his addition to the <br />I <br />building is shown at the rear of the building. It is, the ligh�tl,y stippled <br />rectangle 'immediately beillow the, word component on Sheet C-1., <br />The rear ellevation shows the location of the door to service this a,riea. <br />This elevatiion also, sho�ws that, t,hi,s elevation will be coveiried with <br />exactly the same exter,io�r, m�ateri,al,s as the rest of the building. <br />I I <br />We miet with the,, applicants and thieir architects and a,sikiied them' tx <br />ove,r,l,a,y tihe landsca,pei and utiliiity plans and makel ceirtai,n that there ar <br />no confli,ct,s. They should be prepare�d t,o offer this assura,n�cle at thf,-v <br />meeting O <br />We alsol Informed them that, the curbing surrounding the parking lot <br />must be co�n�crete* They siaid that they understood that requirement, but <br />It should. be clearly identified as such on the approved plans to avoid <br />I <br />the Potential for fu�t,ure miscommunication. <br />I <br />The, landscape plan has been modified. The, applicantsi continue to <br />tmeint to landscapi <br />indicate a, strong comml i i n g,, They propose a n <br />arborvitae he around th�riel,e sides, of the,, lot.1 Green Ash are the <br />4i <br />piri,m�ar,y, overstory trees planted around the perimeter, with Honey L,ocust <br />shown at, the, en�tra,nceis and 'in the parking lislandsO, F --..ensive ground <br />cover and ornamental pla,nt,ingsi are proposed, around the buildingd, <br />