Laserfiche WebLink
This file deals with a spiecial use permit at the corner of T.H. 36 an' <br />'The eng" a 1 <br />Rice Street.1 ineerinicr staff has rev'newed this proposal and ha <br />.0 <br />the follow g recommendations: <br />41 <br />1.1 Sidewalkis to be ic,onstructed along the east and north sides of the <br />lot's <br />2.1 Plans for the relocation of the Sanitary Sewer Main. installation <br />0 <br />of mew w-ate**uiaJLn and storm sewer lines are needed. <br />Permits from,MN'DOT and Rice Creek are needed. <br />4 a 'The, utility plans and landscaping plans should be overlaid to <br />insure placement of trees is NOT on, top of any utility. <br />5, Any, work w, i4thi n Minnesota Aveinue, r ilght-of -way must meet-ling the ' City <br />of' Roseville standards, Any work with "in Rice Street right�of • <br />must meet MNDOT standards'. <br />6.1 North bound onto Rioce Street will have to be made from Minnesota <br />Avenue only. MN'DOT will not give a, permit to turn north form the <br />F <br />Rice Street driveway'. <br />401 <br />7# Care must be taken at construction time to protect for erosion. <br />10 9 <br />Sil,t fenci,ng, and hay bails must be used, An erosion control pla <br />I it, 0 <br />is needed as part of the building permit approval.. <br />0 1 <br />8 Inspection by, an engineering f irm. is, requirea ior all ut Illity <br />mains installed, on thie site. As-bul"Its of the mains will have t <br />be provided within 30 days after completion of work, Testing fo <br />0 <br />the mains will, have to be approved by the City of Roseville"s <br />staf f a <br />90 A u,tili,ty plan is needed as part of the site plan approval. <br />Additional concerns may arise after review of those plans. <br />