Laserfiche WebLink
7rhis, file deals with a special use permit at the corner of T.H,. 36 and <br />Rice Street.1 'The engineering staff has reviewed this proposal and has <br />0 <br />the following recomm,end,at, lions. <br />Sidewalk "is, to be constructed along the east and north sides of the <br />,lot. <br />2, Plans for the relocation of the Sanitary Sewer Main, installation <br />of new watermain, and storm sewer, lines are needed. <br />3, Permits from MNDOT and Rice Creek are needed. <br />4i.. The utility plans and, landscaping plans should be overlaid to <br />ID <br />insure placement of trees is NOT on, top of any utility. <br />G <br />5.1 Any work within Minnesota Avenue right-of-way must meeting the Cit <br />of Roseville standards. Any work within Rice Street right-of-way <br />must meet MKDOT standards. i <br />6. North bound onto Rice Street will have to be made from Minnesota <br />Avenue only,. MND01T will not give a plermit to turn north form the <br />Rice Street driveway.. <br />7q, Care must be taken at construction, time to protect for erosion. <br />Silt fenciong and h,ay bails must be used. An erosion control plan <br />41 <br />is, needed as part, of the building plermiot approval. <br />4 5 <br />8i. Inspection. by an engineering firm is required for all utility <br />mains installed on, the site. As-builts of the mains will have ta <br />be Provided within, 30, days after completion of work. Testiong for <br />the mains will have to be approved, by the City of Roseville"s <br />sitaf f 0 <br />9 isi A utility plan 'is needed as part of' the site plan approval <br />Add itilonal concerns may arise, after review of those plans. <br />