Laserfiche WebLink
Dominium Grolu�p., Case No. 2070 <br />v <br />L i qLtim <br />No information has been submitted regarding site lighting, ThIZ <br />0, <br />information should be submitted for rev,iewl. <br />The Engineering Department has reviewed the proposed plans and <br />indicates, that sidewalk, is to be constructed along the east and north <br />v <br />sides of the lot. They have also requested detailed engineering plans <br />for the relocation of the sanitary sewer main and the installation of a <br />new watermain and stor m sewer lines. <br />I <br />In a,dditioln to utility pilans,, an erosion <br />control Plan i,s needed as part o <br />the building <br />peirmit approval. Care sihou�ld be taken at construction <br />tim <br />to protect from erosion,, Th�ese, pila,ns <br />should designate the <br />locations fo <br />"It fencing <br />and haybales, where needed. The applicant <br />should als, <br />submit plans <br />that ovierlay, the proposed <br />landscape, pla,ns over <br />the propose <br />utility plans <br />to, h <br />ensure tat none of' <br />the prop Iosed trees <br />are locate <br />atoT any utility. Finally, an engineering fiarm will <br />need to b <br />retal"'ned by <br />the applicants, to inspeict <br />a,ll of the utility mains installe <br />oIn the site., <br />As-built drawings of all <br />of these mains, will <br />have to b <br />