My WebLink
|
Help
|
About
|
Sign Out
Home
2011_0124_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2011
>
2011_0124_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2011 4:19:58 PM
Creation date
11/8/2011 3:09:04 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Long Term Goals <br />Develop program to provide fire, safety, u <br />CPR, fire extinguisher training to <br />businesses <br />IN' <br />The Fire Department started offering fire training classes and CPR <br />classes to businesses and community members who request such <br />training. This started with the adoption of the City Fee Schedule on <br />November 17, 2008. RG 3109 <br />The Fire Dept will begin offering CPR/AE at a rate of $80 per <br />student and Safety Training at a rate of $80 per hour. Costs will cover <br />prorated trainer's salary/benefits, books, training materials, <br />administrative time. These services will be offered to businesses once <br />the City's fee schedule is amended to include these fees and this <br />JR2025 goal will be complete. RG 7108 <br />Community Center Discussion U Community Center identified m Adopted Park Master Plan, <br />November 2010 LB 1/11 <br />u Discussions during Master Plan Implementation Phase, <br />November 2010 LB 1/11 <br />Li Will be incorporated into the anticipated Master Plan process to <br />determine need and locations. LB 7108 <br />Establish a Community Resource and u Proposal accepted by the 2009 Leadership St. Paul Program to assign <br />Volunteer Center/ Network with support a group to Roseville to enhance the volunteer program by creating a <br />and coordinating staff to recruiet, train, comprehensive community volunteer model. LB 3109 <br />nurture volunteers. u Researching possible resources needed to establish such a program <br />and what a program of this type would look like. LB 7108 <br />Identify segments with poor or no u No new activity.. 6109 <br />connection. Follow Master plan guide. u Developing Fairview NTP Pathway project for 2009 construction. <br />Address Hwy 3�6 and Snelling crossing Seeking funding opportunities. DS 3109 <br />barriers: tunnels or bridges at Lydia, u Pathway Master Plan adopted September 08. Seeking funding <br />Co C, Co B, or Roselawn opportunities. DS 10108 <br />u Discussed as part of Pathway Plan update, incorporate into final draft <br />plus additional locations. DS 7108 <br />Consider Ro�undabouts, if space and u Second Roundabout to be constructed in Twin Lakes Summer 2010 DS <br />buying R. .W. is feasible 5110 <br />• First Roundabout will be constructed late summer 2009 in Twin <br />Lakes Phase DS 6109 <br />• Roundabout included in Phase I Twin Lakes improvements <br />construction 2009. DS3109 <br />• No new activity. DS 10108 <br />• Look into ROW requirements and identify possible corridors 2009. DS <br />7108 <br />Add buses and routes for flexibility and u Have had additional discussion with Metro Transit regarding <br />suburb-to-suburb travel additional service to Park N Ride DS 4110 <br />• No new activity DS 6109 <br />• Explore opportunities created by new Park N Ride DS 3109 <br />• Discussed this flexibility with Metro Transit for Twin Lakes Park N <br />Ride facility. DS 10108 <br />• Continue to push this issue in all discussions with Metro Transit. DS <br />7108 <br />Encourage development of transiet, u Provided feedback to Metro Transit on proposal for additional Park N <br />walkability and alternate transportation Ride facility in Little Canada at County Road B and Dice St DS5110 <br />• Draft oaf f new residential and commercial zoning codes promotes <br />design that promotes walkability. PT 611 <br />• In anticipation oaf f designing a new zoning code, staff, the Planning <br />Commission, and the City Council are reviewing the use of form- <br />
The URL can be used to link to this page
Your browser does not support the video tag.